Project: Holland Bridge
Contractor: VolkerWessels
Products: Steel Mesh Barrier, Adjustable Safety Post & Shuttering Attachment
View page(s): 27, 32 & 38
Overview: Forming part of the largest
infrastructure project in Holland, the
construction of a second Holland Bridge
across the Ijmeer Channel will widen the
A6 motorway to four lanes in each
direction and led to the specification Steel
Mesh Barrier Edge Protection System.
During the construction of the 300 metre
long bridge, civil engineers VolkerWessels
installed 700 LM of Steel Mesh Barriers
along each side of the extensive concrete
deck and steel works using the Adjustable
Safety Posts and the Shuttering
Attachment.
"We have used COMBISAFE many times
before on projects. Their systems are
user-friendly, versatile and always meet
our strict safety requirements."
Niels Kranenburg, structural engineer,
VolkerWessels
10 CASE STUDIES
CASE STUDY
Source Alwin de Bondt, Volker Infradesign