Delivering WFD Objectives | Fish pass design

10 | Delivering WFD Objectives

FISH PASS DESIGN

PROJECT 3 |

TEMPLEBOROUGH DETAILED DESIGN

LOCATION: Rotherham, South Yorkshire

CLIENT: BRITE Partnership

As a condition of planning approval for

construction of a biomass power station on the

River Don in Rotherham, our client was required to

construct measures to improve fish passage over a

weir immediately adjacent to the site.

WHAT WE DID

• Flood risk modelling

• Developed detailed hydraulic and structural

design of a Larinier fish pass

• Secured local Environment Agency approval

for the technical fish pass solution.

BENEFITS TO THE CLIENT

• Efficiency savings with our ablity to design coffer

dam temporary works for the abstraction point.

• Our 3D modelling capability enables robust

design of scour protection measures

associated with the abstraction point.

Index

  1. Delivering WFD Objectives | JBA Consulting
  2. Delivering WFD Objectives | JBA Consulting
  3. Delivering WFD Objectives | JBA Consulting
  4. Delivering WFD Objectives | Fluvial geomorphology and hydromorphology
  5. Delivering WFD Objectives | Fluvial geomorphology and hydromorphology
  6. Delivering WFD Objectives | Fluvial geomorphology and hydromorphology
  7. Delivering WFD Objectives | Fluvial geomorphology and hydromorphology
  8. Delivering WFD Objectives | Fish pass design
  9. Delivering WFD Objectives | Fish pass design
  10. Delivering WFD Objectives | Fish pass design
  11. Delivering WFD Objectives | JBA Consulting
  12. Delivering WFD Objectives