10 | Delivering WFD Objectives
FISH PASS DESIGN
PROJECT 3 |
TEMPLEBOROUGH DETAILED DESIGN
LOCATION: Rotherham, South Yorkshire
CLIENT: BRITE Partnership
As a condition of planning approval for
construction of a biomass power station on the
River Don in Rotherham, our client was required to
construct measures to improve fish passage over a
weir immediately adjacent to the site.
WHAT WE DID
• Flood risk modelling
• Developed detailed hydraulic and structural
design of a Larinier fish pass
• Secured local Environment Agency approval
for the technical fish pass solution.
BENEFITS TO THE CLIENT
• Efficiency savings with our ablity to design coffer
dam temporary works for the abstraction point.
• Our 3D modelling capability enables robust
design of scour protection measures
associated with the abstraction point.