JBA Consulting
The impacts of disasters, such as deaths, economic hardship, damage to homes and livelihoods, can be avoided or significantly
reduced through pre-event preparedness actions, including flood forecasting and warning, and preparing response mechanisms.
To facilitate these actions, we have developed a strategic flood forecasting framework, Flood Foresight, that is efficient,
transparent, customizable and can be deployed globally.
Challenge
Flood Foresight - Near Real-time and Forecast Flood Inundation Mapping
and Impact Assessment
Location: Global
Client: Insurance companies, infrastructure owners / developers, national governments and NGOs
Solution
Supported by a grant from Innovate UK, a prototype real-time flood monitoring and impact assessment system was developed in
2015. Flood Foresight has since been developed in a fully operational system, deployed in several countries and being used by
insurance companies, infrastructure owners / operators, national governments and NGOs.
Flood Foresight couples real-time and forecast streamflow conditions generated by telemetered river gauges or hydrological
forecast models with a library of pre-computed flood hazard scenarios. The rarity of flooding (expressed as return period, flow or
level) within a localized sub-basin drives a process of generating a flood inundation map (extent and depth) for the whole domain
of the model based on this localized rarity. An impact module calculates flood impact on a client portfolio of assets; these can
include population, infrastructure, buildings, critical facilities, or crops. Flood maps and impact data generated by Flood Foresight
are delivered into the user's preferred software through a web-based data service that is hosted, maintained and supported by
JBA.
Flood Foresight is being used for a range of client applications, including monitoring of indices for flood-based parametric
insurance, as a trigger for pre-anticipatory actions to reduce humanitarian impacts of floods, as a real-time flood impacts module
for national flood risk management, and as input into local authority flood early warning systems. The system has been configured
using a global hydrological model from the Global Flood Awareness System (GloFAS), national-scale hydrological models and
national river gauge telemetry. By default, Flood Foresight uses the JBA Global Flood Map dataset (with a spatial resolution of
5-30m), however it can also be configured to use alternative flood hazard maps, such as those developed by a national authority.
john.bevington@jbaconsulting.com | www.jbaconsulting.com
Benefit
Flood Foresight provides users with a broad-scale flood forecasting and early warning solution. As we already have the
components to deploy the system in any country, it can be deployed rapidly anywhere in the world. This provides a framework
for flood forecasting and early warning, on which more local sources of data can be integrated over time. This flexibility allows
for custom deployments of the tool to meet a range of user requirements. Flood Foresight allows asset owners, humanitarians
or insurers to design anticipatory actions that can be triggered by the forecast inundation and impact maps produced by the
system. This can promote, ex-ante, more effective and appropriate decision making to reduce impacts of floods.