Contractor
selected
award
Detailed
Design
Phase
Task
Linked Resource
Construction
Consult/Consider
Value engineering
implemented
achieving
design objectives?
QS/Contractor
to review and
price
Update design
Ensure
appprovals
and agreements
are in place
H&S
documentation
Final
Planning
Approval
Inspection
programme
PRE-CONSTRUCTION
Spons
External Works
& Lanscapes
Increased
maintenance or
reduced design
life?
Approvals
at risk?
LLFA
Liaison
Liability
period
EA/NRW/
SEPA
Highway
Authority
WaSC
IDB
Risk
Assessment
and site H&S
plan
CDM Regulations NEC4
Engineering &
Tender
Value
Engineering
Pre-construction
information
portal
e-planning
Scotland
Spons Civil
& Highway
NEC4
Subcontract
CIRIA (C768)
of SuDS
CIRIA (C753)
SuDS Manual
B.6 and B.7
Site
Investigation
Report, inc.
Infiltration
Trees/
Protected
Species
Services and
Underground
Structures
Topological
Survey
9